WestPark Issue’s Committee

Westpark Development….

There is a new project “Seaview Heights Developement” just above the ‘pond’…. I contacted GMC Contracting Inc. (907-561-4733) about the project, and their plans regarding working that close to the ‘pond’.   They told me to expect a letter soon to the council with all the details.   As soon as I have it, I will upload it to the website and send out another email.

…………………………………………………………………………………………………………….

Main Detailed groundwater study report: Sand Lake Final Report 011210

Appendices:  Driller’s log SL-1 Driller’s log SL-2 Well log SL-1 well log SL-2

Appendix B Survey Data 1725 6818 14225 020246 23791 700015

KE 21 KE 22 SVOCs_final VOCs

________________________________________________________________

January 11th… Sand Lake and Lucy Pit well logs are here for you to review….

Sand Lake: Log of Well SL-1 Log of Well SL-2

Lucy Pit:  Log of Well ASG-1 Log of Well ASG-2 Log of Well ASG-3

___________________________________________________________________

December 15th 2009…

DOWL/HKM and presented a copies of:

Lucy Pit Conditional Use Permit (click to view PDF)

Sand Lake Fill Pit Conditional Use Permit (click to view PDF)

________________________________________________________________

Resolution 09-05 : Supporting AS&G and DOWL/HKM on the filling of Lucy Pit…

SLCC Resolution 09-05

________________________________________________________________

JM Justification deep monitoring wells 110709 Posted per request from South Anchorage Concerned Coalition

———————————————————————————————————————-

October 12th SLCC meeting, AS&G requested 4 changes to the resolution 09-04 that was passed on September 14th.  Here are the changes they requested….  A brief overview of the proposed changes to the SLCC resolution …..     A motion was put forth to rescind ( remove, make null ) the resolution 09-04 …. vote to rescind passed with 75% of the vote.   It was removed.    DOWL HKM & AS&G have requested to following to be shared and posted….

Lucy Pit Procedures 2009

Lucy Pit well installation and gw monitoring plan

SACC will be sending information as well…. I will post it as soon as I get it.

November 9th’s Sand Lake Community meeting will be focused on discussing the filling of Lucy pit…. Please join us

—————————————————————————————————————————————————–

Anchorage Sand & Gravel have taken a sample of the water at the bottom of the

Lucy Pit and have had it analyzed. The appended letter and corresponding lab

results outline the analyses performed and their findings.

CLICK HERE to go to our website and see the results. Lucy pond water sample results

————————————————————————————————————————

After revisions to the proposed Resolution on Sept. 14th 2009 SLCC meeting, the revised Resolution (#09-04) was aggreed upon and approved by a overwhelming majority.  resolution-09-04-SLCC support of Filling the Lucy Pit 091409-signed ***UPDATE, This resolution was rescinded Oct.12 2009 by a 75% vote.

————————————————————————————————————————

New ‘conceptual park plan’ from DOWL HKM….

Park Concepts

Grading-sled hill 11×17

____________________________________________________________________________

AS&G Fill Procedures

—————————————————————————————————————————

This is from SACC regarding suggested Lucy Pit Water Monitoring……

SACC water monitoring program for Lucy Pit

—————————————————————————————————————————

Here’s is the letter from DOWL HKM regarding the subsurface exploration of Lucy Pit…..

Lucy Pit Hydro Study – Part A

Lucy Pit Hydro Study – Part B

Lucy Pit Hydro Study – Part C

Leave a Reply